Al Tayseer Towers Hotel

The hotel design is based on five, 40 floor towers containing a total of 5.000 rooms and has been built to meet the increasing numbers of pilgrims in Mecca.

Project overview and details

The hotel design is based on five, 40 floor towers containing a total of 5.000 rooms and has been built to meet the increasing numbers of pilgrims in Mecca.

“Originally the project was planned with the installation of static balancing valves in the cooling systems, but we convinced the consultant who was responsible for the project that Frese’s dynamic balancing valves would be a more efficient and economical solution”, says Yasser H. Awwad, Frese’s Regional Sales Manager in Saudi Arabia.

The installation of dynamic valves in the hotel’s cooling system can reduce pump energy consumption in the building by up to 35% due to a higher Delta T and increased system stability, with a further saving of up to 50% achievable through simplified system design and optimal pump control. A significant saving compared to cooling systems using traditional valves.

Solution

The hotel’s cooling system was installed with

  • 6,500 Frese ALPHA dynamic balancing valves
  • 19,500 Frese Ball Valves
  • 6,500 Frese strainers

The building is served by 34 chillers, each rated at 350 tons to deliver a total cooling capacity of 11,900 tons. The hotel was scheduled to welcome the first guests in December 2013.

Read more about Frese ALPHA

About this project

Industry

Buildings & Industry

Country

Saudi Arabia

City

Mecca

Project

Hotel

When

2013

Application

Hotels

Contact person

Yasser Hassan

Regional Sales Manager, Saudi Arabia, Egypt, Bahrain, Jordan & Lebanon

Buildings & Industry

+966 5410 25 405

yasser.hassan@vexve.com

Sales regions

Middle East, Africa

  • Frese